INSPIRATION
Project photos from professionals within the commercial construction and design industry.
Rated as one of the best movers nationwide, Gentle Giant needed an upgraded headquarters to accommodate sales growth yet be within reasonable commuting distance for employees.
LEDCONN provided LED flat light panels for grocery stores like Gelson's to light up the space with smooth, even light distribution.
As a 25-year-old New England beer distributor, integrity flows in Quality Beverage’s blood. To accommodate corporate development, 3 areas needed to be addressed – a rebranding of the existing office space to enhance corporate culture, the addition of outdoor storage, and a loading station.
With eyes on nothing but the future, OMNIlife’s robotic technology is focused on improving recovery time and long-term positive outcomes.
This addition added to the Senior Metal Bellows building consists of a first-floor manufacturing space with a second-story open floor plan for corporate offices, a full-service lunchroom, and an anterior entrance.
Utilizing natural material selection and feng shui principles, Dacon renovated a second floor, 10,000 SF space within a retail block featuring concrete composite desks, slate floors and curved windows to expand natural lighting and exterior vistas.
Employing the efficient processes of design build, a 96,000 SF 3-story office building was created that included a style out center, product development library, 270˚ vista employee fitness room and vendor viewing rooms.
With Boston-based roots extending back to 1928, MEC has never had a losing year based on the business practices of timeliness, fair price and quality execution. They sought an office design reflective of an accomplished heritage, modern innovation and open collaboration.
The resulting 348,000 SF Gordon Food Service facility entailed 2-story executive offices, a cooler dock, freezer, dry goods storage, 6 pump fuel station, and 45 loading docks. Completion time was only 4 months with $264,000 returned in savings.
Using a 4-month time frame, Dacon focused on modernizing and expanding the existing office location. The second-floor was redesigned to accommodate 16 offices, 2 conference rooms and seating for 92 employees using a configuration that maximized existing window space and natural light.
A historical institution, St. George’s believes athletics acts as an extension of the classroom by reinforcing good sportsmanship, teamwork, self-discipline and responsibility.