INSPIRATION
Project photos from professionals within the commercial construction and design industry.
71Above features nearly 3,000 square feet of SageGlass around its perimeter. With SageGlass, 71Above staff can easily control the environment to create a consistently comfortable experience that visually connects patrons to the city below.
Bock Lighting used their Brilliante and Downlight Reflector light fixtures for this Whole Foods location.
Featured here at the Basilica of St. Mary, Mpls. are donor plaques for major roof restoration. GlassArt Design incorporated the copper sheets from old roof into the the scrolls. The glass panels are removable for name additions.
Instructure photo showing a working lounge built using the DIRTT construction system.
Arbor Wood was used to clad the exterior of the 3 level 90,000 square foot Bell Museum located in St. Paul, Minnesota. The Pine used in this project was locally sourced, modified and installed.
Maximo's Sarengetti Black II Polished Porcelain Tile adds texture to the backsplash design and matches the ambiance of the room.
The NeuroDiagnostic Institute - Indianapolis, Indiana. Teknoflor provided 239,000 s.f. of flooring
OCL Glowstick Diverge provides an elegant & contemporary design with end lit diffuser. Custom configurations with either 7 or 14 drop with side, bottom or exit canopy are possible.
As part of a $108.2 million bond for schools, the Maize Unified School District 266 built a top-notch Performing Arts and Aquatics Center. The complex, thought out to host swimming and diving competitions, as well as shows and art events is now a unique and great asset to the student community.
… Read More
The Lourdes High School project utilized Wells Concrete architectural grade precast panels with embedded stone form liners and thin brick for the building exterior.
The Guardian 275® Wall System by Major Industries was the perfect daylighting choice for the Cupertino High school in California.