INSPIRATION
Project photos from professionals within the commercial construction and design industry.
Guests are greeted in the main lobby by a dark wood monumental staircase, which symbolizes a giant tree spiraling up through the space.
C.M. Steel were tasked with constructing and installing the eclectic monumental staircase and once again chose to partner with Glasshape to produce and supply t… Read More
“Glasshape was a wonderful partner in the realization of the glass portion of the project. They scanned the shoe and modeled the glass to fit. The accuracy and quality were impeccable. The edge quality was excellent. I would highly recommend them for any complex geometry, laminated glass project.”
… Read More
Venue Industries provided a pink, 11 foot art-deco inspired banquette with power outlets for this coffee & tea shop.
Fall in love with our Dreamy Collection’s Ever After. With a new gray veining pattern that speaks its mind. A material so perfect, it belongs in a storybook.
The beautiful lecture hall at the Junior Achievement of the Upper Midwest headquarters.
The exterior of Extra Space Storage in St. Louis Park, MN, by Bauer Design Build.
Vetter Stone's Glacier Buff is a dolomitic limestone with a warm, light ochre background and subtle white to beige colored veining. Seen here at CityPlace shopping center in Woodbury, Minnesota.
Photo credit: Elion Partners
Designed by Renzo Piano Building Workshop, Krause Gateway Center serves as the new headquarters for Kum & Go. Visitors and guests can also enjoy the public spaces throughout the building.
Lowa46 includes 148 luxury Minneapolis apartment living, Cubs Foods grocery store, and small-shop retail.
Kick back and enjoy a little lawn bowling at Lowa46 mixed-use development complex located in Minneapolis, MN.
The goal at EKD/JLA was to create a series of social public spaces that weave through the project and are defined by more private offices and conference rooms.
Due to the horizontal nature and free-flowing aspects of the design, a new approach to connections for the panels to structure was required in all areas. The floors had as much as a 35’ distance separating the levels increasing the need for a solution.