DEG Headquarters | NanaWall

 

DEG Headquarters

To open up the ground floor break room area, 36 panels were installed with a total linear run of 107’ and a height of 9’ 3” tall. The panels move centrally from the front and symmetrically to each side and stack conveniently outside of the plane of the opening in custom designed parking bays. These panel parking bays are installed remotely and out of the way of the seating and tables. Additionally, the system has a no floor track option that was used to create an uninterrupted floor expanse. This flowing, threshold-free transition between the break room and the atrium accentuates the floating nature of the “Cloud” above. Small embedded floor sockets are used to lock the panels securely into place when the system is closed.
Project Contributors

Tag a Pro

To top
Great job on adding that image, you ROCK!