In addition to the tube and window frames being carried by the precast, the arched steel truss designed for the Braves’ signage was loaded to the face of the brick inlay panels. The connection consisted of side and top plates that would act as “surrounds” in lieu of a “hard” connection to the chord of the truss. Teflon shims were utilized to allow for the truss to move independently.