At One Bennett Park it was a very difficult concrete frame with outrigger walls and a 3-story mass tuned damper at the top of the building. We worked with the general contractor on site set up to allow pre-cast panels to be set on the building perimeter while the concrete framing proceeded on a very aggressive pace.