Wells Concrete Arden Hills Readiness Center MN Army National Guard Exterior Structural Wall Panels | Wells

 

Arden Hills Readiness Center

To maximize sustainability the design includes geothermal systems, photovoltaic arrays and EnergyStar equipment. The facility is designed to achieve LEED Silver Certification. Wells Concrete produced more than 135,000 sq. ft of precast for this project, with a total of 204 precast members. The new building has both external façades and interior structural support with double tees and structural wall panels. The exterior insulated architectural panels showcase a unique mix of acid etch and formliners enhancing the building appearance.
Project Contributors

Tag a Pro

To top
Great job on adding that image, you ROCK!