Wells Concrete Prime Therapeutics Boulder Lakes Office Front Facade Design | Wells

 

Prime Therapeutics - Boulder Lakes Office

Nearly 70,000 square feet of both black and white insulated precast concrete spandrels with an acid etch and polished finishes were used on the exterior façade. The precast producer was involved in an extensive collaborative effort with HGA in designing the structural systems to support precast.
Project Contributors

Tag a Pro

To top
Great job on adding that image, you ROCK!