ClarkDietrich
West Chester, OH
Brand
Go Back
Back To Projects
Jennie Sealy Replacement Hospital
ClarkDietrich’s largest BIM project to date is the Jennie Sealy Replacement Hospital in Galveston, Texas. The hospital features nearly 250 rooms, surgical suites and intensive-care space. In total, the hospital will encompass 758,000 sq. ft. throughout a seven-level base building with twin tow… Read More
Certifications:
ProSTUD Drywall Framing is backed by comprehensive laboratory testing for strength, fire and sound.
ProSTUD Drywall Framing is backed by comprehensive laboratory testing for strength, fire and sound
ProSTUD Drywall Framing is backed by comprehensive laboratory testing for strength, fire and sound
ProSTUD Drywall Framing is backed by comprehensive laboratory testing for strength, fire and sound.
The MaxTrak System allows the top of the wall stud to float within the track legs.
The MaxTrak System allows the top of the wall stud to float within the track legs.