U.S. Bank Stadium
Minneapolis, MN
As the fourth most expensive NFL venue ever built and with seating for up to 70,000, this stadium is an architectural landmark. The Stadium features a fixed-roof design with the largest span of transparent ETFE material in the U.S.; five large glass pivoting doors; zinc metal exterior panels; seven … Read More
Wells Concrete is proud to be part of the iconic US Bank Stadium. A total of 5,096 pieces of precast were provided and delivered on 1,534 truckloads over the duration of this project. If you laid every single piece end to end, it would be equal to 27 miles.
The construction of the US Bank Stadium set a new standard for sports facilities; the stadium was built in two-and-a-half years and completed six weeks early (and on budget), much faster than any of its NFL counterparts.
Wells Concrete is proud to be part of the iconic US Bank Stadium. The design goal of the stadium was to create a resource that welcomes people of the surrounding metro and the entire state. All of its patrons, users and neighbors can see themselves reflected in the design and materials – their clima… Read More